Lean Design and Lean Scheduling

Loading...
来自 哥伦比亚大学 的课程
Construction Scheduling
446 评分
哥伦比亚大学
446 评分
课程 2(共 4 门,Specialization Construction Management
从本节课中
Lean Design in Construction Scheduling
Sam Spata, of MethodLean, discusses lean design and lean scheduling. The concept of Flow is introduced, the process of how to get from the beginning to the end of a project, as a measurable addition of value.

与讲师见面

  • Ibrahim Odeh, Ph.D., MBA
    Ibrahim Odeh, Ph.D., MBA
    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University
    Director of Research and Founder, Global Leaders in Construction Management