Backward Pass Calculations

Loading...
哥伦比亚大学
4.8(952 个评分) | 12K 名学生已注册
课程 2(共 4 门,营建管理 专项课程
查看授课大纲

您将学习的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

审阅

4.8(952 个评分)
  • 5 stars
    757 ratings
  • 4 stars
    174 ratings
  • 3 stars
    16 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings
GJ

Sep 28, 2019

This course is dedicated to anyone in the construction management industry and/or the willingness to learn about construction management. I will highly recommend this course!

BA

Mar 16, 2019

It was a very dynamic course which contained many useful knowledge. I gained many important information that will help me a lot.\n\nThanks to Coursera and to my Instructors.

从本节课中
Activity on Arrow
Activity on Arrow diagrams are the topic for this module. Professor Odeh will discuss how to draw an activity on arrow diagram and how to number the nodes. Forward and Backward Pass calculations and determining the duration of a project are also covered.

教学方

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

探索我们的目录

免费加入并获得个性化推荐、更新和优惠。