Charting Work Dates and Calendar Dates

Loading...
哥伦比亚大学
4.8(779 个评分) | 10K 名学生已注册
课程 2(共 4 门,营建管理 专项课程
查看授课大纲

您将学习的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

审阅

4.8(779 个评分)
  • 5 stars
    618 ratings
  • 4 stars
    146 ratings
  • 3 stars
    10 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings

Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.

I am challenging myself in ways I did not know was possible. This course, so far, has been inspirational for me both personally and professionally.

从本节课中
Understanding Work Dates and Calendar Dates
In this module, the difference between working dates and calendar dates is explained and how to chart both in a project plan.

教学方

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

探索我们的目录

免费加入并获得个性化推荐、更新和优惠。