Introduction to the Interfering Float

Loading...
来自 Columbia University 的课程
Construction Scheduling
713 个评分
Columbia University
713 个评分
课程 2(共 4 门,Specialization Construction Management
从本节课中
Activity Floats
Professor Odeh introduces the types of floats in a construction project including; total float, free float, interfering float and independent float.

与讲师见面

  • Ibrahim Odeh, Ph.D., MBA
    Ibrahim Odeh, Ph.D., MBA
    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University
    Director of Research and Founder, Global Leaders in Construction Management

探索我们的目录

免费加入并获得个性化推荐、更新和优惠。