Lean Design and Lean Scheduling

video-placeholder
Loading...
查看授课大纲

您将学习的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

审阅

4.8(1,667 个评分)

  • 5 stars
    79.66%
  • 4 stars
    17.87%
  • 3 stars
    1.97%
  • 2 stars
    0.29%
  • 1 star
    0.17%

GV

Sep 9, 2020

Filled StarFilled StarFilled StarFilled StarFilled Star

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

LF

May 13, 2020

Filled StarFilled StarFilled StarFilled StarFilled Star

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

从本节课中

Lean Design in Construction Scheduling

Sam Spata, of MethodLean, discusses lean design and lean scheduling. The concept of Flow is introduced, the process of how to get from the beginning to the end of a project, as a measurable addition of value.

教学方

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

探索我们的目录

免费加入并获得个性化推荐、更新和优惠。