Numbering Nodes on a Diagram

Loading...
查看授课大纲

您将学习的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

审阅

4.8(1,355 个评分)
  • 5 stars
    79.63%
  • 4 stars
    18.22%
  • 3 stars
    1.62%
  • 2 stars
    0.29%
  • 1 star
    0.22%
VT
Dec 23, 2019

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

LF
May 13, 2020

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

从本节课中
Activity on Arrow
Activity on Arrow diagrams are the topic for this module. Professor Odeh will discuss how to draw an activity on arrow diagram and how to number the nodes. Forward and Backward Pass calculations and determining the duration of a project are also covered.

教学方

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

探索我们的目录

免费加入并获得个性化推荐、更新和优惠。