PERT Probability Example

video-placeholder
Loading...
查看授课大纲

您将学习的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

审阅

4.8 (1,540 ratings)
  • 5 stars
    79.35%
  • 4 stars
    18.11%
  • 3 stars
    2.01%
  • 2 stars
    0.32%
  • 1 star
    0.19%

VT

Dec 23, 2019

Filled StarFilled StarFilled StarFilled StarFilled Star

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

LF

May 13, 2020

Filled StarFilled StarFilled StarFilled StarFilled Star

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

从本节课中

Program Evaluation & Review Technique (PERT) and Range Estimating