Recommendations for Building AON Diagrams

video-placeholder
Loading...
查看授课大纲

您将学习的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

审阅

4.8(1,638 个评分)

  • 5 stars
    79.73%
  • 4 stars
    17.88%
  • 3 stars
    1.89%
  • 2 stars
    0.30%
  • 1 star
    0.18%

VT

Dec 23, 2019

Filled StarFilled StarFilled StarFilled StarFilled Star

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

LF

May 13, 2020

Filled StarFilled StarFilled StarFilled StarFilled Star

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

从本节课中

Activity Precedence Diagrams

In this module, learners will create Activity Precedence Diagrams, also referred to as Activity on Node Diagrams, which graphically represent the construction activities in a project and their relationships.

教学方

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

探索我们的目录

免费加入并获得个性化推荐、更新和优惠。