FL
Dec 26, 2016
The Course is very interesting and helpful from all prospective. I'm the project Owner and it was great experience for better understanding of the scheduling, different techniques and Lean Delivery.
VT
Dec 23, 2019
This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.
创建者 Juan P C
•Oct 16, 2017
Great introductory course for non civil engineers or architects that want to get involved in the industry
创建者 Donavan E
•Oct 10, 2019
I feel that the softewares used in this industry was not presented properly. the visual aids were poor
创建者 Ram j
•May 16, 2020
Informative. I would recommend taking the course to understand the basics of construction scheduling.
创建者 Erich S
•Jul 20, 2020
I like the calculations. The Lean guy, Sam Spata covers too much too fast during his lectures.
创建者 Kalamba B
•Jul 3, 2020
like this course, but much deeper learning would be more welcome on certain topics. thank you
创建者 Elodie T
•May 3, 2020
Complete courses, but pity that some of the projection like software modules are bad quality.
创建者 joshua w
•May 13, 2017
Very informative and helps to look at other not traditional scheduling methods.
创建者 Wiadita D A
•May 4, 2021
The risk allocation and planning section is a bit difficult to understand.
创建者 Diego A
•May 13, 2020
The first three weeks of the course are way too basic and slow to develop.
创建者 Michelle W
•Mar 17, 2021
I wish it wasn't "about" scheduling, but instead actually had scheduling.
创建者 Zhanar B
•Feb 10, 2017
I like the course for its clear structure and straightforward content.
创建者 Detorrie T
•Apr 5, 2018
This was a fast-paced and intense course brimming with great content.
创建者 Aleksandra A
•Dec 4, 2020
I expected to see more examples of real-life construction projects.
创建者 Kevin S
•Jun 7, 2020
Great intro to construction scheduling, from project flow to tech.
创建者 amr e
•Oct 22, 2017
good course with a great experience as a beginner in scheduling.
创建者 Hanna E
•Oct 3, 2017
Good information, but some errors in one of the quizzes.
创建者 Evangelos K
•May 13, 2021
Great refresher from college course. Highly recommend.
创建者 Jorge J L
•May 6, 2017
Great course, very thorough, rigorous and engaging.
创建者 José P
•Oct 10, 2020
An exciting new way of scheduling construction.
创建者 Durgesh K S
•Oct 2, 2018
I got alot of knowledge..... about scheduling.
创建者 Alfonso P
•Feb 25, 2018
Prof. Odeh is very good. Worth watching!
创建者 Bishwajit B
•Sep 8, 2019
The Lean methods are best articulated.
创建者 a1
•Aug 18, 2019
I liked the course, it is very useful
创建者 Darisa S R
•Aug 14, 2020
Pretty good, but very basic concepts
创建者 justin v
•Dec 31, 2018
just take good notes and you'll pass